Today was another
dreary rainy day. Most of the projects were indoor projects. Before
the photographer showed up and between rain showers, some of the
guys went up on the roof to attempt to repair the leaks.
Over the course
of the day,
Bill was seen taking piles of branches to the dump.
Bruce and Jerry plan to install a combination
heater and AC unit in the wall. It's a type of heat pump, so
they tell me.
This
is the rear wall of a new classroom. Right now it just looks
like a rear wall of the sanctuary.
In the right hand corner is a false cabinet/closet.
In the rear room was a false closet. This small
frame hides a full size closet.
Jeff and Donna remove the false wall to open up
the closet. Jeff's inside the closet, probably standing in the
hole in the floor that goes through to the crawl space. There was
no cover over it, so the inside of the closet was open to the crawlspace.
And it smelled bad, too!
Jerry is inspecting the hole in the wall where
the new heating unit will go
Mark is removing the floor tiles in the bathroom.
This bathroom is located in the Pastor's office.
Rich and Jean are cleaning hardware in preparation
for putting the final touch on the cabinets behind the stove.
The false wall of the closet is gone and Gail's
now sitting on the floor of the closet with her feet dangling in
the hole in the floor.
Donna was kind enough to ask Gail if she's afraid of the boogie
man who lives in the crawl space! Thanks, Donna.
Bob Koch brought beef barbeque, also known as
sloppy Joe's.
Donna, Jean, and Rich enjoying lunch break.
The gnome gives the nod of approval to the new
heater in the office.
Rich and Jean finished putting together the cabinets
behind the stove. Looks great, Rich.