New Building Pictures - April 24th

Tree of Life Logo
 
     
 
Home
 
     

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 
 

Planning the work for the day

Bruce, Mark, Rocco, Bob, and Gene plan the work for the day.

   

Kitchen doorway is widened.

Kitchen Doorway is widened

   

Holes in floor for beams

There's a lot going on in this picture. Note the holes in the floor to allow positioning a beam under the sanctuary floor.

At the far end of the picture, the floor beams have been removed and concrete rubble placed on top of the existing concrete slab.

The rubble came from the cement block walls (on the left side of the picture) which have been mostly removed.

 

The floorbeams have been remove, the concrete walls from the left side knocked out and the rubble placed in the hole.

Concrete rubble under the floor

Hole in floor, missing walls This view, from the other side of the sanctuary, shows how much the room has opened up with the walls removed.
 

And as you move back in the room, you can really see how it's opening up.

Room is really opening up
   
 Hallways are being sheet rocked  Things are really moving along. This hallway is being sheetrocked.

The new entrance way has been cut in.

New doors to the sanctuary

The outside view of the new entrance.

New entrance from outside

   

The new entranceway and something different. More roof work!

Entranceway and roof

   
Getting materials to the door and roof Getting materials to the new doors and to the roof is a bit easier too.
   
And more roof work. Roof work proceeds
   
Side view The side view that's not seen very often.
   
Rocco, Bruce, Gene, Janet, Mark, and Bob enjoying lunch break. Lunch break