Bruce, Mark, Rocco, Bob, and Gene plan the
work for the day.
|
| |
|
Kitchen doorway is widened.
|

|
| |
|

|
There's a lot going on in this picture. Note the
holes in the floor to allow positioning a beam under the sanctuary
floor.
At the far end of the picture, the floor beams have been removed
and concrete rubble placed on top of the existing concrete slab.
The rubble came from the cement block walls (on the left side
of the picture) which have been mostly removed.
|
|
|
|
The floorbeams have been remove, the concrete
walls from the left side knocked out and the rubble placed in
the hole.
|

|
|
|
|
 |
This view, from the other side of the sanctuary,
shows how much the room has opened up with the walls removed. |
| |
|
And as you move back in the room, you can really
see how it's opening up.
|
 |
| |
|
 |
Things
are really moving along. This hallway is being sheetrocked. |
|
|
|
The new entrance way has been cut in.

|
The outside view of the new entrance.

|
| |
|
The new entranceway and something different.
More roof work!
|

|
| |
|
 |
Getting materials to the new doors and to the
roof is a bit easier too. |
| |
|
| And more roof work. |
 |
| |
|
 |
The side view that's not seen very often. |
| |
|
| Rocco, Bruce, Gene, Janet, Mark, and Bob enjoying
lunch break. |
 |